• Hydro Electrical Power Plants
  • AGUS I 80 MW Hydro Electric Power Plant

    • Installed Capacity: 80 MW ( 2x40 MW)
    • Scheme of Development: Underground
    • Location: Marawi City, Mindanao
    • Scope of Works:
    1. Civil Works- Site Development
    Lake Approach Channel: 860 meters
    2. Power Intake- 6.10 meter high opening with wheel gates
    3. Steel Lined Power Tunnels: 80 meters long x 10 meters
    4. Underground Powerhouse: 70.5 meters length x 40 meters width x 17 meters high
    5. High Arch Type Surge Channel: 75 meter below the ground
    6. Concrete lined tailrace tunnel: 2 @ 6.8 diameter x 1,500 meter
    7. Open tailrace outlet channel: 175 meter long with varying excavation depth from 8.00
    to 34.00 meter to reach the back.