• The Bataan Export Processing Zone
  • Supply, lay, install and test 8,000 linear meter PVC Sewer Pipeline (350-100mm). Trench excavation for 8,000 linear meter sewer pipeline to a maximum depth of 5.5m with heavy shoring using H-Beams and steel plates due to a very poor ground condition coupled with strong water seepage due to its proximity to the sea. Underground hori, drilling installation of 200mm PVC Sewer Pipeline of 300 linear meter. ; Excavate and concrete sewer manhole up to a maximum of 5.5 m in depth including installation of 200 units cast iron manhole covers; construction of seven (7) sewerage pumping stations ; Construction of sewerage treatment plant (STP) complete with Grit Chamber, Oxidation Ditch, Sedimentation & Chlorination Tank Structures including Electromechanical Equipment.